View Single Post
  #1  
Old 04-21-2006, 08:38 PM
loosegroove loosegroove is offline
Registered User
 
Join Date: Apr 2006
Location: Texas
Posts: 21
Incorrect day showing for scheduled job

I have setup my copy job to run daily at 2:00 AM. It is now Friday at 7:30 PM my time and I just setup the job. SuperDuper is stating that the next time to run the job is Sunday at 2:00 AM. I would expect the time to be Saturday at 2:00 AM.

Yes, my system clock is correct.

--
Bronson
__________________
17" 1.83 GHz Intel iMac | 2GB RAM | 160GB HD | Mac OS X 10.5.6
Reply With Quote