Shirt Pocket Discussions

Shirt Pocket Discussions (https://www.shirt-pocket.com/forums/index.php)
-   General (https://www.shirt-pocket.com/forums/forumdisplay.php?f=6)
-   -   Scheduling problem (https://www.shirt-pocket.com/forums/showthread.php?t=6902)

todivefor 10-25-2014 08:44 AM

Scheduling problem
 
I have been using SD for years with no problem. Now I can't get my schedules to work the way I want. I have to be doing something stupid! I am running SD 2.7.3 (v93) on OS X 10.9.5 on a Macbook Pro 15" mid 2012. I have 2 settings files. A is erase backup clone (erase destination which is external, and backup all files). B is incremental clone backup (backup all files to destination using smart update). What I want to accomplish is: the first weekend of the month that my external drive is plugged in, do an erase destination backup all (A). On any weekday that external is plugged in, do a smart update backup (B). I load settings for A and setup schedule no problem. I load settings for B and setup schedule. It does not setup a new schedule, but acts like an edit of the first schedule. What am I doing wrong that I cannot setup 2 schedules?

dnanian 10-25-2014 08:49 AM

Hold down Option and click Schedule... to create a second schedule with the same drive pair.

todivefor 10-26-2014 08:57 AM

Quote:

Originally Posted by dnanian (Post 32971)
Hold down Option and click Schedule... to create a second schedule with the same drive pair.

Thank you! Love this product. Had been using in conjunction with TM (to network drive). TM was so undependable, gave it up. SD completely dependable.

dnanian 10-26-2014 03:45 PM

Well...nothing it completely dependable, of course, but we try the best we can.


All times are GMT -4. The time now is 05:52 AM.

Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.