Multiple scheduled copies
Hi Dave,
How do I set up additional scheduled copies of the same source and destination drive. It seems if I have a scheduled copy of a given source and destination drive and want an additional schedule with the same drives, SD changes the previously scheduled copy not allowing an additional schedule. |
Hold down Option when clicking "Schedule..."
|
Looks like the number 1 has been added to the destination drive. Any significance to that?
Thanks |
got it, sorry for the less than stellar question ;)
|
Glad you're all set.
|
All times are GMT -4. The time now is 01:49 PM. |
Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.